West Bengal State Electricity Distribution Co. Ltd. v/s Noor Alam Mollah & Others


Company & Directors' Information:- P & M DISTRIBUTION PRIVATE LIMITED [Active] CIN = U51109WB2007PTC115999

Company & Directors' Information:- ALAM & CO LTD [Strike Off] CIN = U60210WB1946PLC014227

Company & Directors' Information:- S & E DISTRIBUTION PRIVATE LIMITED [Strike Off] CIN = U74999TZ2014PTC020161

Company & Directors' Information:- M V T DISTRIBUTION PRIVATE LIMITED [Active] CIN = U74900KA2015PTC078055

Company & Directors' Information:- C L M DISTRIBUTION PRIVATE LIMITED [Strike Off] CIN = U51909MH2003PTC142339

    First Appeal No. A/261/2018

    Decided On, 18 July 2019

    At, West Bengal State Consumer Disputes Redressal Commission Kolkata

    By, THE HONOURABLE MR. SAMARESH PRASAD CHOWDHURY
    By, PRESIDING MEMBER & THE HONOURABLE MRS. DIPA SEN (MAITY)
    By, MEMBER

    For the Appellant: Suvendu Das, Advocate. For the Respondent: Parijat Das, Ranita Nath, R.A. Mollah, Advocates.



Judgment Text

Samaresh Prasad Chowdhury, Presiding Member

The instant appeal under Section 15 of the Consumer Protection Act, 1986 (hereinafter referred to as ‘the Act’) is at the behest of Opposite Party No.1West Bengal State Electricity Distribution Company Limited (WBSEDCL) to impeach the Final Order dated 17.01.2018 passed by the District Consumer Disputes Redressal Forum, Howrah (in short, ‘Ld. District Forum’) in Consumer Complaint No. 78/2016. By the impugned order, the Ld. District Forum allowed the complaint lodged by Respondent No.1 Noor Alam Mollah under Section 12 of the Act with the direction upon the Opposite Party No.1 WBSEDCL to give electric connection to the tenanted premises of the complainant on the basis of his application subject to payment of requisite fees, if not paid earlier within 30 days from the date of order.

The Respondent No.1 herein being Complainant lodged the complaint before the Ld. District Forum asserting that he is a monthly tenant inducted by Late Noor Islam Sardar, the predecessor-in-interest of OP Nos. 2 to 6 at a monthly rental of Rs.250/- payable according to English Calender. Since induction, he was enjoying electricity from the landlord’s meter and had been regularly paying electricity charges as per demand of the landlord but surprisingly on 28.09.2014 the present landlords cut off the supply of electricity without any intimation to him. Finding no other alternative, the complainant applied for a new meter for his tenanted premises and on the basis of his application, a quotation had been issued and the complainant deposited the amount on the basis of the same. However, the OP No.1 through a letter dated 26.06.2015 informed the complainant that electric connection cannot be supplied as outstanding dues are pending. The complainant states that he or any of his family members had any electric service connection in their name in the tenanted premises and as such OP has no right to claim such illegal amount of Rs.60,458/- as claimed. Ultimately, the respondent no.1 lodged the complaint with prayer for several reliefs, viz. – (a) to direct the OP No.1 that the demand of lump sum amount of Rs.60,458/- claimed by the letter dated 21.11.2015 is illegal and not tenable in law; (b) to direct the OP No.1 to supply electric connection in the name of him at the tenanted premises; (c) compensation of Rs.10,000/- and (d) litigation cost of Rs.5,000/- etc.

The Appellant being OP No. 1 by filing a written version has stated that when it was observed that an outstanding amount of Rs.58,923/- is lying pending in the name of Noor Alam Sardar (original landlord) and Jillur Rahaman amounting to Rs.34,494/- and Rs.24,429/- respectively aggregating Rs.58,923/- by the letter dated 21.09.2015 the complainant was informed about the reason for non-effecting the service connection as the outstanding amount of the premises was not cleared.

The Respondent Nos.2 to 6 i.e. the wife and sons of the erstwhile landowner i.e. the present landowners though appeared before the Ld. District Forum and filed written version but ultimately did not contest.

After assessing the materials on record, the Ld. District Forum by the impugned final order allowed the complaint with certain directions upon OP No.1, as indicated above. To assail the said order, OP No.1 has come up in this Commission with the present appeal.

Mr. Suvendu Das, Ld. Advocate for the Appellant has submitted that when it is apparent that an amount of Rs. 58,923/- is outstanding as electricity charges in the premises in question, in view of Regulation No.13.9 of WBERC Notification No.46 dated 31.05.2010, the connection in the tenanted premises of respondent no.1 could not be effected and when the Ld. District Forum has passed the order without considering the provisions of law, the impugned order is liable to be set aside.

Per contra, Mr. Parijat Das, Ld. Advocate for the Respondent No.1has contended that electricity is an essential service and in catena of decisions, the Hon’ble Supreme Court as well as our parent High Court has observed that the right to electricity is a derived right from right to shelter granted under fundamental rights of the Constitution of India, the appellant had no reason not to provide electric connection to a tenant, whose electric connection was disconnected by the landlord. He has also contended that to ascertain the actual state of affairs, the respondent no.1 being a hawker in profession and illiterate person filed one R.T.I. dated 07.12.2018 to the Public Information Officer through his literate friend one Sri Arup Das to collect information as to whether any new connection of meter has been allotted or installed and to that effect no information has been given simply showing the provisions of Section 8(1)(j) of R.T.I. Act, 2005. He has also contended that despite such alleged outstanding amount, a new meter has been installed in the premises of landlord at Baltikuri Sekhpara, P.O.- Baltikuri, P.S.- Dasnagar, Dist-Howrah. Though such a big mercy has been shown to the landowner but no such mercy has been bestowed upon the poor respondent no.1, who is a hawker in profession. Referring several decisions of the Hon’ble Supreme Court of India, National Consumer Commission and the High Court at Calcutta, he has finally submitted that the impugned order being in accordance with the provisions of the Act, it should not be interfered with.

We have considered the submission advanced by the Ld. Advocates appearing for the Appellant and Respondent No. 1. Despite receipt of notice, the Respondent Nos.2 to 6 did not appear to contest. Therefore, we proceeded to decide the appeal in absence of the Respondent Nos.2 to 6/landlords.

Undisputedly, one Noor Islam Sardar was the owner of a premises lying and situated at Baltikuri Sheikhpara, P.O.-Baltikuri, P.S.-Dasnagar, Dist-Howrah. The respondent no.1 has been inducted as a tenant in respect of one R.T. Shed room consisting of pucca brick wall with verandah and common privy in respect of the same premises at a monthly rental of Rs.250/- per month. It is also not in dispute that since induction, the respondent no.1 was enjoying electricity from the landlord’s meter and the said electric connection was cut off by the landlords on 28.09.2014.

In that backdrop, the Respondent No.1 had applied for a new meter in respect of his tenanted premises being application No.1002733895 in his own name from WBSEDCL and on the basis of quotation issued by the appellant, the respondent no.1 has deposited the amount of Rs.868/- as security deposit and inspection procedure was concluded without any hindrance. Subsequently, the appellant refused to give electric connection simply on the ground that there was an outstanding amount of Rs.58,923/- is lying pending against the plot in question where the tenancy of respondent no.1 stands.

Needless to say, Section 43 of the Electricity Act, 2003 is the main provision casting an obligation upon every distribution licensee to give supply of electricity to the premises when the application by the owner or occupier of such premises is made and Sub Section (1) of Section 43 of the said Act enjoins upon the distribution licensee to give such supply of electricity to the owner or occupier of the premises, as the case may be, within one month after receipt of the application requiring such supply.

The question came up for consideration before a Full Bench of Calcutta High Court reported in 2011 (2) CHN 768 (Abhimanyu Majumdar –vs. – Superintendent Engineer & Anr.) whether right to have electricity under the ambit of Article 21 of Constitution of India by including such right within the derived right ‘right to shelter’ under Article 21 of the Constitution of India could be available to trespassers and unauthorised occupier; and, whether right to shelter a derived/emanated fundamental right could be extended to the unauthorised occupants, squatters, encroachers of any land or premises to provide as a consequential relief to supply electricity on breach of statutory provisions under the Electricity Act, 2003 and the Works of Licenses Rules, 2006 as well as on public interest’? and in answering to the question it has been observed –

“.......if the applicant is found to be in settled position of the premises in question and they will be entitled to the enjoyment of the electricity so long they are not dispossessed by due process of law on compliances of all formalities required under the Act”.

The facts and circumstances and materials on record indicate that the respondent no.1/complainant is a tenant under respondent nos. 2 to 6 and as such being a tenant, he is entitled to electric connection in accordance with legislative mandate as embodied in Section 43 of the Electricity Act, 2003.

The contention of the Ld. Advocate for the Appellant about not adherence to the Regulation No.13.9 being Notification No.46/WBERC dated 31.05.2010 does not appear to be applicable in the facts and circumstances of the case inasmuch as the respondent no.1/complainant had been living in the plot as a tenant under Noor Islam Sadar, since deceased and now under the legal heirs and successors of the said Noor Islam Sardar. In their written version, the appellant no.1 has categorically mentioned that the amount of Rs.34,494/- and Rs.24,429/- aggregating Rs.58,923/- are outstanding in the names of Noor Islam Sardar and Jillur Rahaman respectively. Therefore, from the statement of appellant itself, it would be quite clear that for non-payment of outstanding dues, there is hardly any reason to attribute liability upon a poor tenant, who is a hawker in profession. Moreover, there is no allegation whatsoever that the respondent no.1 had any nexus with the landlords to deprive the WBSEDCL from getting their outstanding dues.

In that perspective, the Ld. District Forum has rightly passed the impugned order. Taking into consideration of all the relevant factors, though there was deficiency on the part of the appellant yet the Ld. District Forum did not award any amount of compensation or litigation cost. Without complying with the said order and ignoring the object of Section 43 of the Act that right to electricity is a fundamental right, the instant appeal has been filed just to harass the respondent no.1/complainant further. The matter requires an enquiry as to whether in between 02.06.2014 and the date of filing complaint i.e. on 18.02.2016 any electric connection has been allotted or installed in the premises of Baltikuri Sekhpara, P.O.- Baltikuri, P.S.- Dasnagar, Dist-Howrah in the name of landowners, viz.-Rahaman Sardar, Shaidukl Sardar, Safique Sardar or Tafique Sardar or Jinna Bibi (respondent nos. 2 to 6) and if it is found the connection has been allotted or installed, whether the outstanding amount of Rs.58,923/- (as stated on behalf of WBSEDCL) has been realised or not.

On evaluation of materials on record and having heard the Ld. Advocates appearing for the respective parties, we have no hesitation to hold that the instant appeal is totally devoid of any merit and the object behind filing of the appeal is just to cause unnecessary harassment of respondent no.1/complainant. In any case, the appeal being harassing one, it is liable to be dismissed with cost of Rs.10,000/-.

For the reasons aforesaid, the appeal i

Please Login To View The Full Judgment!

s dismissed on contest with cost of Rs.10,000/- and the said cost must be paid by Appellant WBSEDCL in favour of Respondent No. 1 within 90 days for untold misery suffered by him. The impugned final order is hereby affirmed. The Registrar of this Commission is directed to send a copy of this order to the Ld. District Consumer Disputes Redressal Forum, Howrah, for information. The Registrar of the Commission is further directed to send a copy of the order with speed post or by special messenger to the Chairman-cum-Managing Director, West Bengal State Electricity Distribution Company Limited, Bidyut Bhawan, Salk Lake City, Kolkata with a request upon him to depute competent person(s) to enquire as to whether the Station Manager, Salap CCC, P.S.- Domjur, Dist-Howrah has installed any new meter on any date in between 02.06.2014 and 18.02.2016 (the date of lodging complaint) in the premises of respondent nos. 2 to 6/OP Nos. 2 to 6 at Bultikuri Sheikhpara, P.O.-Bultikuri, P.S. Dasnagar, Dist-Howrah and if any such electric connection is found to have installed, whether in accordance with Notification No.46/WBERC dated 31.05.2010 (vide 13.9), the outstanding amount of Rs.58,923/- in respect of the said premises has been realised or not.
O R







Judgements of Similar Parties

11-09-2020 M/s. S.M. Cement Industries Rep. By One of Its Partners Namely, Manoj Sureka, Assam Versus Power Distribution Company Ltd. & Others High Court of Gauhati
07-09-2020 M. Jaikumar Versus The Chairman Tamil Nadu Generation and Distribution Corporation ltd. Tamil Nadu Electricity Board, Chennai & Others Before the Madurai Bench of Madras High Court
19-08-2020 Chairman-Cum M.D., Andhra Pradesh Southern Power Distribution Co. Ltd., Tripathi & Others Versus T. Rajeswari & Others National Consumer Disputes Redressal Commission NCDRC
17-08-2020 Welworth Software Private Limited Versus Sun Distribution Services Pvt. Ltd. & Another. High Court of Delhi
06-08-2020 S. Suresh Kumar Versus The Chief Engineer (Personnel)Tamil Nadu Generation and Distribution Corporation Ltd.,TANGEDCO, Chennai & Others Before the Madurai Bench of Madras High Court
30-07-2020 Jalgaon Golden Transport Pvt. Ltd. Versus The Union of India, Through its Secretary, Ministry of Consumer Affairs, Food & Public Distribution, New Delhi & Others In the High Court of Bombay at Aurangabad
30-07-2020 M/s. Linga Transformers, Rep. by its Managing Partner, Villupuram & Another Versus Tamilnadu Generation and Distribution Corporation Ltd., Rep. by its Chairman & Another High Court of Judicature at Madras
30-06-2020 Andhra Pradesh Eastern Power Distribution Company Ltd., AP. & Others Versus Kimudu Monu & Others National Consumer Disputes Redressal Commission NCDRC
30-06-2020 TATA Power Delhi Distribution Limited Versus Rampal High Court of Delhi
26-06-2020 Bismi Aquatic Products, Rep by its Partner, M. Ashraf Ali Versus The Superintending Engineer, Ramanathapuram Electricity Distribution Circle, TANGEDCO, Ramanathapuram & Another Before the Madurai Bench of Madras High Court
17-06-2020 Shankar Saran Versus Chairman & Managing Director Eastern Power Distribution Co. of A.P. National Consumer Disputes Redressal Commission NCDRC
15-06-2020 Nabi Alam @ Abbas Versus State (Govt of NCT of Delhi) High Court of Delhi
09-06-2020 Maharashtra State Electricity Distribution Co. Ltd. Versus Principal, College of Engineering, Pune High Court of Judicature at Bombay
03-06-2020 P. Venkatasubramani & Another Versus Tamil Nadu Generation & Distribution Corporation Ltd., Rep. by its Chairman cum Managing Director, Chennai & Another High Court of Judicature at Madras
02-06-2020 R. Sridhar Versus The Chief Engineer (Personnel), Tamil Nadu Electricity Board, Tamil Nadu Electricity Generation & Distribution Circle, Chennai & Others High Court of Judicature at Madras
01-06-2020 Telangana State Southern Power Distribution Company Limited & Another Versus M/s. Srigdhaa Beverages Supreme Court of India
26-05-2020 Thangarajar Mills Pvt.Limited, Unit III, Rep., by its Manager (Administration) & Another Versus The Tamil Nadu Generation & Distribution Corporation Ltd., (TANGEDCO), Rep., by its Chairman & Managing Director, Chennai & Others Before the Madurai Bench of Madras High Court
10-04-2020 Shadab Alam Versus State High Court of Delhi
03-04-2020 Sai Wardha Power Generation Limited Versus The Tata Power Company Limited Distribution & Others Supreme Court of India
17-03-2020 Maharashtra State Electricity Distribution Company Limited Through its Superintending Engineer, Admn. Versus M/.Pranavditya Spinning Mills Ltd. High Court of Judicature at Bombay
11-03-2020 S. Durai Versus The Assistant Engineer, CIT Nagar-I, Chennai Electricity Distribution Circle, Saidapet, Chennai & Another High Court of Judicature at Madras
06-03-2020 Sakuntala Devi Versus Dr. Md. Mumtaz Alam & Others National Consumer Disputes Redressal Commission NCDRC
06-03-2020 Tirunelveli Solar Project Pvt. Ltd., Rep. by Mr.P.Elavarasu, Asst. General Manager – Project, Rajasthan Versus Tamil Nadu Generation & Distribution Corporation Limited (TANGEDCO), Rep. by its Chairman, Chennai & Others High Court of Judicature at Madras
04-03-2020 Mahey Alam Versus State High Court of Judicature at Allahabad
04-03-2020 The Secretary, Tamil Nadu Electricity Employees Central Organisation, Virudhunagar Versus The Superintending Engineer, TANGEDCO, Virudhunagar Distribution Circle, Virudhunagar Before the Madurai Bench of Madras High Court
28-02-2020 Maharashtra State Electricity Distribution Co. Ltd. Versus Union of India & Others Supreme Court of India
28-02-2020 Tata Power Delhi Distribution Ltd Having its Registered office at NDPL House, Hudson Lines, New Delhi V/S Delhi Electricity Regulatory Commission Through its Secretary, New Delhi Appellate Tribunal for Electricity Appellate Jurisdiction
28-02-2020 K. Ramesh Versus Hansraj Verma, The Chairman, The Tamil Nadu Electricity Generation & Distribution Corporation Ltd, Chennai & Others High Court of Judicature at Madras
28-02-2020 Tata Power Delhi Distribution Limited Through its authorized signatory, New Delhi Versus NTPC Limited Through its Chairman, New Delhi & Others Appellate Tribunal for Electricity Appellate Jurisdiction
20-02-2020 M/s Century Rayon (A division of Century Textile & Industries Ltd.), Maharashtra V/S Maharashtra State Electricity Distribution Company Ltd., Through its, Chief Engineer (Commercial), Maharashtra And Others Appellate Tribunal for Electricity Appellate Jurisdiction
17-02-2020 The Superintending Engineer Thiruvannamalai Electricity Distribution Circle TANGEDCO, Thiruvannamalai Versus The Presiding Officer Industrial Tribunal, Tamil Nadu, Chennai & Another & Another High Court of Judicature at Madras
13-02-2020 Md Shafique Alam Versus State of Bihar High Court of Judicature at Patna
12-02-2020 The Superintending Engineer, Tamil Nadu Electricity Board, Nilgiris Electricity Distribution Circle, Udhagamandalam, Nilgiris District & Another Versus Indira & Others High Court of Judicature at Madras
11-02-2020 M. Velusamy Versus The Superintending Engineer, Tamil Nadu Generation and Distribution Corporation Ltd., TANGEDCO), General Construction Circle, Tatabad, Coimbatore & Others High Court of Judicature at Madras
06-02-2020 R. Balakrishnan & Others Versus The Chairman cum Managing Director, Tamil Nadu Generation & Distribution Corporation Ltd, Chennai & Another High Court of Judicature at Madras
04-02-2020 Md. Mofazzular Rahman & Others Versus Md. Sarfaraz Alam & Others High Court of Judicature at Calcutta
04-02-2020 K. Rajasekar Versus The Chairman, Tamil Nadu Electricity General and Distribution Corporation Limited (TANGEDCO), Chennai & Others High Court of Judicature at Madras
03-02-2020 K. Rajaram & Another Versus The Chairman, Tamil Nadu Generation and Distribution and Corporation Ltd. & Others High Court of Judicature at Madras
29-01-2020 Laxmibai Versus Maharashtra State Electricity Distribution Co. Ltd. & Another In the High Court of Bombay at Aurangabad
23-01-2020 M/s Arun Vyapar Udyog Limited, Rep.by its General Manager K. Venkataraman Versus The Superintending Engineer, TANGEDCO, Chennai Electricity Distribution Circle/North Tamil Nadu Electricity Board, Chennai High Court of Judicature at Madras
18-01-2020 Mokhtar Alam @ Md Mokhtar Alam Versus State of Bihar High Court of Judicature at Patna
14-01-2020 S.M. Zaheer Alam Versus National Council for Teacher Education (NCTE) through its Chairperson, New Delhi & Others High Court of Judicature at Patna
10-01-2020 M/s. J.P. Electrical Enterprises Chandrapur Prop. Priyavanda & Others Versus The Maharashtra State Electricity Distribution Co. Ltd. & Another In the High Court of Bombay at Nagpur
09-01-2020 R. Sridhar Versus The Chief Engineer/Distribution, Chennai egion/North, Tamil Nadu Electricity Generation & Distribution Corporation, Chennai & Another High Court of Judicature at Madras
08-01-2020 Maharashtra State Electricity Distribution Company Limited – (MSEDCL) – through its Superintending Engineer, Nagpur Rural Circle & Another Versus Electricity Ombudsman, Nagpur & Others In the High Court of Bombay at Nagpur
08-01-2020 Parwez Alam @ Md Prawez Alam Versus State of Bihar High Court of Judicature at Patna
02-01-2020 Maharashtra State Electricity Distribution Co. Ltd., through its Executive Engineer Versus Ramakant Vithobaji Gaikwad & Others In the High Court of Bombay at Nagpur
31-12-2019 M/s. Sai Krishna Alloys, Rep. by its Partner, N. Anbalagan Versus The Superintending Engineer (Metro) Tamil Nadu Electricity Board, Coimbatore Electricity Distribution Circle, Coimbatore High Court of Judicature at Madras
11-12-2019 Tanveer Alam Versus Dr. Mohammad Massod Alam & Others West Bengal State Consumer Disputes Redressal Commission Kolkata
11-12-2019 Anusaya & Another Versus Maharashtra State Electricity Distribution Co. Ltd., through its Chairman cum managing Director, Prakash Garh & Others In the High Court of Bombay at Nagpur
04-12-2019 M/s. Shriram Distribution Services Pvt. Ltd. Versus M/s. A.N. Traders Pvt. Ltd. High Court of Delhi
28-11-2019 The Superintending Engineer, Tamil Nadu Electricity Board (Now known as Tamil Nadu Generation and Distribution Corporation Limited), Tiruvannamalai Versus The Presiding Officer (FAC), Additional Labour Court, Vellore & Another High Court of Judicature at Madras
28-11-2019 The Superintending Engineer, Vellore Electricity Distribution Circle, Tamil Nadu Generation and Distribution Corporation Limited, Vellore Versus The Inspector of Labour, Authority under the Industrial Establishments (Conferment of Permanent Status to Workmen) Act, Vellore & Others High Court of Judicature at Madras
25-11-2019 Ch. Mukunda Rao Versus Northern Power Distribution Company Ltd., of Telangana State, rep. by its Chairman & Managing Director, Warangal & Others High Court of for the State of Telangana
22-11-2019 The Superintending Engineer, TNEB, Kanchipuram Electricity Distribution Circle, Kanchipuram Versus The Inspector of Labour, Thiruvallur & Others High Court of Judicature at Madras
22-11-2019 Meiyarasan Versus The Superintending Engineer, Mettur Electricity Distribution Circle, Metturdam & Others High Court of Judicature at Madras
22-11-2019 S. Anbazhagan & Others Versus The Chairman cum Managing Director, Tamil Nadu Generation and Distribution Corporation, Chennai & Another High Court of Judicature at Madras
22-11-2019 P. Lakshmipathi & Others Versus The Tamil Nadu Electricity Generation & Distribution Corporation Ltd., (TANGEDCO), Rep., by its Chairman, Chennai & Others High Court of Judicature at Madras
20-11-2019 R. Ravikumar & Others Versus The Tamilnadu Electricity Generation & Distribution Corporation Ltd., Represented by the Chairman, Chennai & Others High Court of Judicature at Madras
13-11-2019 Saghira Bano Versus Mahmood Alam & Others High Court of Judicature at Calcutta
07-11-2019 R. Gnanavel Versus The Tamil Nadu Electricity Generation & Distribution Corporation Ltd., Represented by the Chairman, Chennai & Others High Court of Judicature at Madras
07-11-2019 B. Varadharaj Versus The Superintending Engineer, Dharmapuri Electricity Distribution Circle, TNEB/now TANGEDCO, Dharmapuri & Others High Court of Judicature at Madras
07-11-2019 G.K. Sankar Versus The Tamil Nadu Electricity Generation & Distribution Corporation Ltd., Represented by the Chairman, Chennai & Others High Court of Judicature at Madras
07-11-2019 R. Jagatheeswaran & Others Versus The Chairman cum Managing Director, Tamil Nadu Generation & Distribution Corporation Ltd., Chennai & Others High Court of Judicature at Madras
07-11-2019 The Superintending Engineer, Kallakurichi Electricity Distribution Circle, Tamil Nadu Generation & Distribution Corporation, Kallakurichi Versus Inspector of Labour, Villupuram & Others High Court of Judicature at Madras
07-11-2019 R. Arul & Others Versus The Tamil Nadu Electricity Generation & Distribution Corporation Ltd., Represented by the Chairman, Chennai & Others High Court of Judicature at Madras
07-11-2019 T. Muthukumaran & Others Versus The Tamil Nadu Electricity Generation & Distribution Corporation Ltd., Represented by The Chairman, Chennai & Others High Court of Judicature at Madras
07-11-2019 The Superintending Engineer, Tamil Nadu Electricity Board, Kallakurichi Electricity Distribution Circle Versus Inspector of Labour, Villupuram & Others High Court of Judicature at Madras
06-11-2019 Maharashtra State Electricity Distribution Company Limited (MSEDCL) Versus Godrej and Boyce Manufacturing Company Limited High Court of Judicature at Bombay
05-11-2019 The Superintending Engineer, Tamil Nadu Generation & Distribution Corporation Limited, Villupuram Versus G. Ravi & Another High Court of Judicature at Madras
04-11-2019 R. Vinodkumar Versus The Tamil Nadu Electricity Generation & Distribution Corporation Limited, (TANGEDCO), Chennai & Another High Court of Judicature at Madras
04-11-2019 G.R. Srinivasan Versus The Superintending Engineer, TANGEDCO, Dharmapuri Electricity Distribution Circle, Tamil Nadu Electricity Board, Dharmapuri & Another High Court of Judicature at Madras
02-11-2019 Kalaguri Balaji & Others Versus The A.P. Southern Power Distribution Company Ltd., (APSPDCL) & Others High Court of Andhra Pradesh
01-11-2019 Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) Versus Karam Chand Thapar & Bros High Court of Judicature at Madras
01-11-2019 K. Shanmugam Versus The Superintending Engineer, Gobi Electricity Distribution Circle, Tamil Nadu Generation & Distribution Corporation Ltd.,(TANGEDCO), Gobichettypalayam High Court of Judicature at Madras
30-10-2019 The Superintending Engineer, Tamil Nadu Generation and Distribution Corporation Limited, Thiruvannamalai Electricity Distribution Circle, Thiruvannamalai Versus The Presiding Officer, Additional Labour Court, Vellore & Another High Court of Judicature at Madras
24-10-2019 Tata Power Delhi Distribution Ltd. NDPL House Versus Manoj Misra & Others Supreme Court of India
24-10-2019 The Superintending Engineer, Namakka Electricity Distribution Circle, Tamil Nadu Electricity Board, Namakkal Versus The Inspector of Labour, Office of the Inspector of Labour, Authority under the Tamil Nadu Industrial Establishment, (Conferment to permanent Status to Workmen) Act 1981, Namakkal & Others High Court of Judicature at Madras
21-10-2019 The Superintending Engineer, Tamil Nadu Electricity Board, Villupuram Electricity Distribution Circle Versus The Presiding Officer, Labour Court, Cuddalore & Another High Court of Judicature at Madras
14-10-2019 The Superintending Engineer, Tiruvannamalai Electricity Distribution Circle, TANGEDCO Versus The Inspector of Labour, hiruvannamalai & Others High Court of Judicature at Madras
14-10-2019 The Superintending Engineer, Tiruvannamalai Electricity Distribution Circle, TANGEDCO., Vengikkal, Thiruvannamalai Versus The Inspector of Labour, Thiruvannamalai & Others High Court of Judicature at Madras
14-10-2019 The Superintending Engineer, Dharmapuri Electricity Distribution Circle, Tamilnadu Generation & Distribution Corporation Limited & Another Versus The Inspector of Labour, Krishnagiri & Others High Court of Judicature at Madras
01-10-2019 The Superintending Engineer, Salem Electricity Distribution Circle, Salem Versus The Government of Tamil Nadu, Represented by its Secretary to Government, Chennai & Others High Court of Judicature at Madras
27-09-2019 The Superintending Engineer, Cuddalore Electricity Distribution Circle, Tamil Nadu Electricity Board, Cuddalore Versus The Presiding Officer, Labour Court, Cuddalore & Another High Court of Judicature at Madras
25-09-2019 The Superintending Engineer, Tamil Nadu Generation and Distribution Corporation Limited, Villupuram Electricity Distribution Circle Versus V. Muthukumarasamy & Others High Court of Judicature at Madras
25-09-2019 The Superintending Engineer, Tiruvannamalai Electricity Distribution Circle, Vengikkal, Tiruvannamalai Versus The Government of Tamil Nadu, Represented by its Secretary to Government, Energy Department, Chennai & Others High Court of Judicature at Madras
25-09-2019 The Superintending Engineer, Tamil Nadu Electricity Board, Thiruvannamalai Electricity Distribution Circle, Thiruvannamalai Versus The Presiding Officer, Vellore & Another High Court of Judicature at Madras
25-09-2019 The Superintending Engineer, Thirupathur Electricity Distribution Circle, TANGEDCO, Vellore District Versus The Inspector of Labour, Krishnagiri & Others High Court of Judicature at Madras
25-09-2019 The Superintending Engineer, Tamil Nadu Electricity Board, Vellore Electricity Distribution Circle, Vellore Versus The Presiding Officer, Vellore & Another High Court of Judicature at Madras
25-09-2019 The Superintending Engineer, Tamil Nadu Electricity Board, Thiruvannamalai Electricity Distribution Versus The Presiding Officer, Labour Court, Vellore & Others High Court of Judicature at Madras
24-09-2019 Babli Khutiya Versus West Bengal State Electricity Distribution Co.Ltd. & Others West Bengal State Consumer Disputes Redressal Commission Kolkata
20-09-2019 M/s. Tamil Nadu Generation & Distribution Corporation Ltd., Mettur Dam, Rep. by its Superintending Engineer Versus The Commissioner of Central Excise, Salem High Court of Judicature at Madras
16-09-2019 R. Jayalakshmi Versus The Chief Engineer / Distribution, Tamil Nadu Generation & Distribution Corporation, Chennai & Others High Court of Judicature at Madras
12-09-2019 Nizamuddin @ Saiyad Nizamuddin Versus Saiyad Shahnawaz Alam @ Laddan & Others High Court of Judicature at Patna
09-09-2019 Ghulam Yazdani & Another Versus Mumtaz Yarud Dowla Wakf, Malakpet, Hyderabad, rep. by its Hony. Secretary, Nawab Mahboob Alam Khan & Others High Court of for the State of Telangana
02-09-2019 West Bengal State Electricity Distribution Co. Ltd. Rep. Chairman & Managing Director & Others Versus Jainuddin West Bengal State Consumer Disputes Redressal Commission Kolkata
28-08-2019 B. Vinayagamurthy & Others Versus The Tamilnadu Electricity Generation & Distribution Corporation Limited, Represented by The Chairman, Chennai & Others High Court of Judicature at Madras
21-08-2019 West Bengal State Electricity Distribution Company Ltd. & Others Versus M/s. Orion Metal Pvt. Ltd. & Another Supreme Court of India
16-08-2019 M/s. Amritrashi Apartment Pvt. Ltd. Versus J.B. Rayees Alam & Others High Court of Judicature at Calcutta
16-08-2019 M/s Jalan Polytubes Private Limited, Patna & Another Versus The South Bihar Power Distribution Company Limited, Patna & Others High Court of Judicature at Patna