Atul Gulati & Another v/s Varsha Mehra & Others


Company & Directors' Information:- ATUL LIMITED [Active] CIN = L99999GJ1975PLC002859

Company & Directors' Information:- VARSHA CORPORATION LIMITED [Active] CIN = U24134MH2000PLC130217

Company & Directors' Information:- K R MEHRA & CO PRIVATE LIMITED [Active] CIN = U15410DL2012PTC234602

Company & Directors' Information:- A. MEHRA AND COMPANY PRIVATE LIMITED [Active] CIN = U51109DL2000PTC105672

Company & Directors' Information:- GULATI AND CO PVT LTD [Under Process of Striking Off] CIN = U51909HR1957PTC000128

    Ex. S.A. 2 of 2018, CM Appl No. 54552 of 2018, 1396 of 2019

    Decided On, 17 July 2019

    At, High Court of Delhi

    By, THE HONOURABLE MR. JUSTICE YOGESH KHANNA

    For the Appellants: Deepak K. Sharma, Ashish Sharma, Advocates. For the Respondents: Sanjeev Sindhwani, Senior Advocate with Aman Nandrajog, Arjun Nanda, Advocates.



Judgment Text


Yogesh Khanna, J.

1. This second appeal is against the judgment dated 1.9.2018 passed by the learned District and Sessions Judge, South-East District, Saket Courts, New Delhi in RCT/ARCT No. 22/2018 whereby the order dated 21.7.2018 passed by the learned ACJ/CCJ/ARC, South-East District, Delhi was upheld.

2. The facts as alleged by the petitioner are as under:

(i) Late father of the appellants and respondent Nos. 2 to 5 herein i.e. Shri Subhash Chander Gulati was the original tenant of the Shop No. 12, Defence Colony Market, New Delhi-110024 (hereinafter referred as "demised shop") owned by the respondent No. 1;

(ii) after the death of Shri Subhash Chander Gulati and his wife Smt. Krishna Gulati, the appellants and respondent Nos. 2 to 5 herein became the tenants of the demised shop;

(iii) respondent No. 1 filed an Eviction Petition bearing No. E134/08/05 under Section 14(1)(g) of the Delhi Rent Control Act, 1958 (hereafter referred as the 'DRC Act') against the appellants and respondents No. 2 to 5 in respect of the demised shop;

(iv) appellants and respondents No. 4 & 5 were proceeded ex parte and the eviction petition was decreed vide judgment dated 27.5.2009 in favour of the respondent No. 1 and against the appellants as well as respondents No. 2 to 5 with the direction to respondent No. l to reconstruct and complete the work of rebuilding within a period of 10 months and thereafter place the appellants and respondent Nos. 2 to 5 herein in occupation of the basement;

(v) respondents No. 2 & 3 filed an appeal bearing No. 27/2009 against the said judgment but it was dismissed vide judgment dated 9.11.2009, which allegedly is not in the knowledge of the appellants herein;

(vi) the Execution Petition No. 83031/2016 was thus filed for executing the judgment and decree dated 27.5.2009, however, proceedings therein were adjourned on appearance of the appellants to enable them to file an appeal for setting aside the judgment and decree dated 27.5.2009;

(vii) thereafter an application under Order 9 Rule 13, CPC was filed in the eviction petition No. E134/08/05 in the Court where the execution petition was also pending. In the meanwhile, on 3.5.2017 the learned executing Court directed the appellants and respondents No. 2 to 5 to handover the peaceful possession to the respondent No. 1 within two months from the date of such order and thereafter the respondent No. 1 was to reconstruct the property within ten months of receiving the vacant possession in terms of order dated 9.11.2011 passed by the learned appellant Court;

(viii) Execution First Appeal No. 14/2017 was filed by appellants in this Court, but after brief arguments it was withdrawn by the appellants;

(ix) on 15.12.2017, the application under Order 9 Rule 13, CPC was also dismissed by the learned Trial Court. On 23.5.2018, the learned executing Court dismissed the objections filed on behalf of the respondents No. 2 & 3; and

(x) on 21.7.2018, once again the objections were filed, but were dismissed by the learned ARC, Saket Courts, New Delhi. The appeal against the order was also filed before learned District and Sessions Judge, which was dismissed vide judgment dated 1.9.2018 and on 4.9.2018 the respondent No. 1 received the physical possession of the demised shop with the assistance of the Bailiff and the execution petition was disposed of. The appellants are in appeal against the said judgment dated 1.9.2018.

3. In the appeal the foremost argument raised by the appellant is qua the user of basement. It is argued the basement being not allowed to be used for commercial purposes under the Master Plan 2021, the learned Courts below ought not to have directed the appellants to be put in possession of the basement to run their garment shop. It is alleged by the appellants as per the Municipal Bye laws, the basement can only be used for storage purposes as such the orders passed the learned Trial Court, the Appellate Court as also of the learned executing Court(s) are void and non est.

4. Prior to coming to this argument, I would like to refer to the relevant portions of the judgment dated 27.5.2009 passed in Eviction Petition No. E134/08/05 which notes as under:

“5. Respondent Nos. 1 and 2 filed the detailed reply to the petition and strongly disputed the contention raised therein. Respondent Nos. 3 to 6 were proceeded ex parte on 26.3.2009. Respondent No. 1 and 2 opposed the application on the ground that petitioner is not the owner of the demised property. Respondent No. 1 and 2 stated in their reply that plan sanctioned by MCD does not permit commercial use of the first and second floor in the shopping area of Defence Colony market. It was also stated that even the basement can be used for storage purpose as per the proviso of Delhi Municipal Corporation Act. It was next contended in the reply that the estimate quoted by the respondent through its architect are false. The respondent Nos. 1 and 2 further contended that the petition is bad for mis-joinder and non-joinder of necessary party. M/s Standard Stores is the tenant and respondent Nos. 1 and 2 are the only partners and are in use, occupation, possession, dominion and control of the demised property. Hence it is contended that petition is liable to be dismissed for misjoinder and non-joinder of necessary parties. It was also stated that respondents will loose customers if the proposed construction is allowed. Respondent Nos. 1 and 2 stated that application is liable to the dismissed as the petitioner has not chosen to file the petition under Section 23 of the Delhi Rent Control Act. It was also averred in the reply that petition is not possessed with sufficient funds to carry out this construction. It was finally stated in the reply that the real motive of the applicant is to get the respondent evicted from the tenanted premises. Applicant/petitioner filed the replication wherein the averment of the application were re-affirmed and reiterated.

xxx xxx xxx

19. Mr. Shailender Chopra learned Counsel for the respondent submitted during the course of arguments that the respondent Nos. 1 and 2 have elected to be placed in occupation of the demised property from which they are to be evicted. Respondents are directed to hand over the vacant possession of the shop No. 12, Defence Colony Market, New Delhi to the petitioner within a period of 2 months from the date of this order i.e. on or before 27.7.2009. The petitioner/landlord shall complete the construction within 10 months of receiving the possession. The petitioner shall on the completion of the work of renovation of the building or re-building place the respondent Nos. 1 and 2 in occupation of the basement of the ship No. 12, Defence Colony Market, New Delhi on agreed rental or on standard rent to be determined by this Court. File be consigned to record room.”

5. The learned District and Sessions Judge, South East District in ARCT No. 27/2009 against the judgment dated 27.5.2009 vide its judgment dated 9.11.2011 inter alia noted:

“19........... It has been argued that in the name of being reinducted in the demised premises after rebuilding the basement floor has been offered which is not fair as it would result in space available in the tenancy being shortened on account of stair case running within the ground floor.

31. The next submission on behalf of the appellant is that the sanctioned plans on basis of which the impugned judgment was passed have since become invalid and, therefore, in absence of re-validation, the impugned order ought not be sustained.

32. I do not think the landlady can be made to suffer on account of the validity of the sanctioned plans having come to an end on account of the construction on their basis having not commenced within the prescribed period for the simple reason such works could not have been undertaken by the landlady without the tenant making way for such purposes. With the tenant continuing to hold the possession, construction in the nature of rebuilding is virtually impossible, what with such works including the earth to be dug out for a basement to be added. The appeal having been filed against the impugned judgment, the landlady chose to be patient and let the legal proceedings run their course. The plans have been sanctioned. This itself shows that proper plans have been prepared within the meaning of Section 14(8) of DRC Act. It is only that the sanctioned plans would require to be revalidated for commencement of the construction to be carried on. The landlady cannot be brought into a vicious circle wherein she would first be called upon to get the plans revalidated and then come and press to the Court for the eviction order to be passed.

33.xxx

34. In these circumstances, Hon'ble Supreme Court held that a procedure can be devised to protect the interests of both the tenant and the landlord, specially by taking care of apprehension expressed by the tenant that the property may remain lying unreconstructed in spite of being vacated by the tenant and followed by demolition if the plans for proposed reconstruction are not sanctioned by the local authority. It was held by the Hon'ble Supreme Court that decree of eviction passed by the High Court was to be sustained but a condition was added that the landlords shall submit the plans of reconstruction for the approval of the local authority. Only on the plans being sanctioned by the local authority, the decree of eviction would be available for execution. Such sanctioned or approved plans were to be produced before the executing Court whereupon the executing Court was to allow a reasonable time to the tenant for vacating the property and delivering possession to the landlord-decree holders.

35.xxx

36. The final submissions of the appellants are that it was not proper on the part of the Rent Controller to direct the appellants to be put in possession of the basement floor since such portion would be dissimilar to the tenanted portion held by them at the ground floor. It is further their grievance that the portion being offered at the ground floor would be lesser in size then the one held at the ground floor, on account of being stair cases added. They also submit grievance that the rent Controller has indicated in the impugned judgment that he might be fixing standard rent for such space in which the tenants are to be re-inducted. This, according to them, is not envisaged in the provisions governing such petitions as under Section 14(1)(g) of DRC Act.

37. xxx

38. Thus, the appeal is found devoid of merits and is dismissed, though with the rider that the order of eviction shall be put into execution, requiring the tenant to give up the possession temporarily for purposes of reconstruction, only upon the landlady showing to the satisfaction of the executing Court that she has obtained revalidation of the building plans from the concerned authorities. For such purposes the landlady shall approach the executing Court after informing the tenant in writing at the suit premises, with advance copy of the application to be moved. In the event of the Rent Controller recording satisfaction, the appellants would stand directed to hand over the vacant possession of the suit premises within two months thereof and the respondent No. 1, in turn will be duty bound to complete the construction within 10 months of receiving the vacant possession.”

6. So the contentions of the appellants viz. the basement floor cannot be allowed to be given to them, as raised before the learned Rent Controller and before the learned RCT was duly addressed and hence now would operate as res judicata.

7. I would also like to refer to the order dated 3.5.2017 passed in Ex.Pet. No. 83031/2016 by the learned executing Court which inter alia besides other contentions also notes as under:

“Perusal of the order dated 9.11.2011 passed by the learned Appellate Court reveals that the DH/petitioner/landlord was directed that petitioner/DH shall obtain revalidation of building plan from concerned authority. Only on the plans being sanctioned by the local authority, the decree of eviction would be available for execution.

8. This order was also taken in appeal before this Court vide EFA No. 14/2017 which was not pressed and was accordingly dismissed vide order dated 31.1.2017.

9. Yet again on 21.7.2018 objections were filed, but were again dismissed vide the order of same date. The operative portion of said order passed by learned executing Court notes:

“Counsel for JD Nos. 2 and 4 has submitted that he is pressing the objections solely on the ground that the DH has failed to comply the conditions imposed by learned District & Sessions Judge Sh. R K Gauba, vide order dated 9.11.2011. Perusal of said order shows that the appeal was dismissed but with a rider that execution shall be proceeded further only upon the landlady showing to the satisfaction of the Executing Court that she had obtained re-validation of the building plans from the concerned authorities.

However perusal of file, shows that vide order dated 3.5.2017, learned Predecessor of this Court had taken on record the fresh grant of sanction for reconstruction by SDMC which is valid up to 3.10.2021 alongwith the sanctioned plan and the satisfaction has been recorded that there is no impediment for the execution of the judgment/decree dated 27.5.2009. Admittedly, the appeal filed by JD Nos. 2 and 4 against said order has been dismissed. Therefore, there is no substance in objections. Moreover, the rejection of DH's earlier sanction plan in 2010 or 2012 by MCD authorities has no consequence as present sanction plan is of 2016. Further, no objections had been filed by JD Nos. 2 & 4 despite entering appearance since December, 2016/March 2017. Objections were not filed even after the application of JD Nos. 2 and 4 filed under Order 9 Rule 13 was dismissed on 12.2.2018. This shows that the objections are being filed just to delay the execution proceedings. Therefore, considering the aforesaid facts and circumstances, objections filed on behalf of JD Nos. 2 & 4 stands dismissed.

Let warrants of possession of the suit property be issued against the JD on filing of PF for next date.”

10. Thus, the appellants before the learned executing Court had limited their argument only qua compliance of conditions imposed in order dated 9.11.2011 vis-a-vis revalidation of the building plan. This order was yet again challenged before the learned RCT in appeal No. ARCT No. 19/2018, but said appeal was also dismissed vide judgment dated 1.9.2018. Never a plea of fraud upon the Court was taken. Rather the arguments of the appellants before such Courts were restricted to shortening of space in basement instead of putting them in basement and hence now cannot again raise such a plea viz. the basement cannot be allotted to them.

11. The appellants are joint tenant with their brothers viz. respondents Nos. 2 to 5. Admittedly, some of the respondents filed appeal against the eviction order dated 27.5.2018 wherein the direction to put the appellant in basement was given. The said appeal was dismissed on 9.11.2011. Since their brothers had filed an appeal, the appellants being the joint tenants cannot now urge the factum of ignorance or non filing of appeal. The fact that the basement was given to the appellants, rightly or wrongly, was never agitated after 2011 either before this Court or before the Supreme Court, hence the judgment dated 27.5.2009 and 9.11.2011 to this effect have become final. Even the plea that the plan was never got revalidated is not available as the fresh grant of sanction was obtained by respondents from SDMC, valid till 3.10.2021.

12. Admittedly, the executing Court could not have travelled beyond the decree as held in M/s. Brakewel Automotive Components (India) Private

Please Login To View The Full Judgment!

Limited v. P.R. Saelvam Alagappan, III (2017) SLT 513=2017 AIR SC 1577. 13. Further in National Textile Corporation Ltd & Another v. Ashval Vaderaa, 167 (2010) DLT 602, the Coordinate Bench of this Court noted: “19...........The principle of res judicata, as is well known, would not only apply in different proceedings arising out of the same cause of action but would also apply in different stages of the same proceedings so that if an issue has been decided at an earlier stage against a party it cannot be allowed to be re-agitated by him at a subsequent stage in the same suit or proceedings.” 14. This Court in Shri Iresh Duggal v. Shri Virender Kumar Seth and Others, 2015 (1) RLR 409 held as under: “6. ......Therefore, the decision taken at the stage of preliminary decree that the premises belong to the partnership firm and not only to the defendant Nos. 1 and 2 is res judicata against the respondent Nos. 1 and 2/defendant Nos. 1 and 2 and therefore at the stage of final decree proceedings, respondent Nos. 1 and 2/defendant Nos. 1 and 2 now cannot again re-agitate this issue. .....” 15. Thus, to my mind the appellants have no right to agitate the factum of being shifted to basement instead of the ground floor time and again and hence are precluded to raise such a plea per principles of res judicata. Qua his submission that the respondent has not taken permissions from various authorities viz. structural safety/fire safety etc, cannot be agitated herein before this forum since this is an appeal against orders under the DRC Act. 16. In view of above, the appeal has no merit and is accordingly dismissed. Pending application, if any, also stands disposed of. No orders as to costs. Appeal dismissed.
O R







Judgements of Similar Parties

24-09-2020 Civil Surgeon-Cum-Chief Superintendent Versus Varsha Chachlani National Consumer Disputes Redressal Commission NCDRC
04-09-2020 Atul Kumar Versus State of Bihar High Court of Judicature at Patna
21-07-2020 Divya Gulati Versus State of A.P. rep. by its Principal Secretary Medical Health & Family Welfare Department, Velagapudi & Another High Court of Andhra Pradesh
07-07-2020 Atul Vinodkumar Gorsawala Versus State of Gujarat High Court of Gujarat At Ahmedabad
25-06-2020 Rahul Mehra @ Daddu Versus State of Karnataka, State by Ramanagara Rural Police, Bangalore High Court of Karnataka
24-06-2020 M/s. Atul Aggarwal & Sons Versus M/s. Mercedes Benz India Pvt. Ltd. National Consumer Disputes Redressal Commission NCDRC
17-06-2020 Atul Kumar Pandey Versus Kumar Avinash High Court of Judicature at Calcutta
29-04-2020 BCH Electric Limited Versus Pradeep Mehra Supreme Court of India
27-04-2020 Aishwarya Atul Pusalkar Versus Maharashtra Housing & Area Development Authority & Others Supreme Court of India
29-01-2020 Atul Kumar Jain & Another Versus Shourya Towers Pvt. Ltd. Delhi State Consumer Disputes Redressal Commission New Delhi
28-01-2020 Parsvnath Developers Limited Versus Sangeeta Mehra & Another National Consumer Disputes Redressal Commission NCDRC
27-01-2020 Rasleen Kaur @ Rasleen Gulati Versus The State (Govt. of NCT of Delhi) High Court of Delhi
09-01-2020 Atul Kumar Singh Versus State of Bihar Through Principal Secretary, Urban Development Department, Govt of Bihar, Patna High Court of Judicature at Patna
06-01-2020 Atul Kapur Versus Arun Kapur & Others High Court of Judicature at Madras
24-12-2019 Atul Kumar Sarkar & Others Versus Union of India & Others High Court of Judicature at Calcutta
18-11-2019 Anand Rao Korada Resolution Professional Versus M/s. Varsha Fabrics (P) Ltd. & Others Supreme Court of India
13-11-2019 Atul Kumar Singh Versus Nitish Kumar & Others High Court of Delhi
01-11-2019 Mehra Cosmetics Versus Ram Kumar Gulati & Others High Court of Delhi
11-10-2019 Less Than Equals Three Services Pvt. Ltd. & Another Versus Paras Mehra & Others High Court of Delhi
04-10-2019 Sarabjit Singh & Others Versus Atul Kumar High Court of Punjab and Haryana
02-09-2019 Roop Sarees & Another Versus Atul Kapoor & Others High Court of Delhi
23-08-2019 Atul Sharma & Others Versus Bhumika Aarti Sharma & Others High Court of Delhi
21-08-2019 Union of India & Others Versus T.R. Mehra Supreme Court of India
31-07-2019 Brij Mohan & Others Versus State of Punjab, Through Vipan Gulati & Another High Court of Punjab and Haryana
01-07-2019 Atul Kumar Gupta & Others Versus Mitthan Lal Aggarwal & Others High Court of Delhi
28-06-2019 The Branch Manager, Future General India Insurance Company Limited, Rep. by Senior Manager & Others Versus S.L. Varsha & Others High Court of Gujarat At Ahmedabad
17-06-2019 Ashesh Busa Versus Atul Gandhi High Court of Judicature at Bombay
10-06-2019 Principal Commissioner of Income Tax 1 Versus Atul Limited High Court of Gujarat At Ahmedabad
02-05-2019 Vijay Mehra Versus State of Rajasthan, Through PP High Court of Rajasthan Jaipur Bench
01-05-2019 Maharashtra Archery Association Versus Rahul Mehra & Others Supreme Court of India
30-04-2019 Varsha Versus Kamlesh & Another High Court of Madhya Pradesh Bench at Indore
25-04-2019 The State of Maharashtra Versus Atul Rama Lote High Court of Judicature at Bombay
15-04-2019 Ashok Kumar Mehra & Another Versus The State of Punjab Supreme Court of India
10-04-2019 Varsha Garg & Another Versus State of MP. & Others High Court of Madhya Pradesh Bench at Indore
05-04-2019 Atul Agrawal Versus State Of Chhattisgarh High Court of Chhattisgarh
04-04-2019 Atul Chandra Das (D) Through Lrs. Versus Rabindra Nath Bhattacharya (D) Thr. Lrs. & Others Supreme Court of India
02-04-2019 Ashok Mehra Versus Enforcement Officer High Court of Punjab and Haryana
28-03-2019 Manoj Kumar Beria Versus Atul Gupta & Another High Court of Judicature at Calcutta
19-03-2019 Atul Gupta & Others Versus S. Chand & Company Limited & Another High Court of Delhi
15-03-2019 Atul Kumar Sharma Versus State (NCT of Delhi) & Another High Court of Delhi
27-02-2019 Sunder Lal Mehra Versus State of Madhya Pradesh High Court of Madhya Pradesh
20-02-2019 Atul Kumar Mittal Versus Indian Institute of Technology Delhi Through its Registrar & Others High Court of Delhi
19-02-2019 Shravan. A. Mehra & Another Versus Superintendent of Central Tax, Represented by the Authorised Officer & or Prosecutor Attached this Honble Court High Court of Karnataka
14-02-2019 Nitish Kumar Versus Atul Kumar Singh & Others High Court of Delhi
12-02-2019 BCH Electric Limited Versus Pradeep Mehra High Court of Delhi
11-02-2019 M/s. Seamac Formulations Private Limited, Represented by its Managing Director Atul Talwar & Others Versus The State of Tamil Nadu, Represented by the Drugs Inspector, Thiruvallur District High Court of Judicature at Madras
06-02-2019 M/s. BCH Electric Limited Versus Pradeep Mehra & Others High Court of Delhi
05-02-2019 Parvin Mehra & Others Versus The Arya Samaj, Lawrence Road, Amritsar & Others High Court of Punjab and Haryana
04-02-2019 Aarshiya Gulati (Minor) Thr. Next Friend & Others Versus Kuldeep Singh Gulati & Others High Court of Delhi
04-02-2019 Principal Commissioner of Income Tax Versus Atul Ltd. Supreme Court of India
04-02-2019 Aarshiya Gulati (Minor) Thr. Next Friend & Others Versus Kuldeep Singh Gulati & Others High Court of Delhi
24-01-2019 Commissioner of Customs Versus M/s. Atul Automations Pvt. Ltd. & Another Supreme Court of India
10-01-2019 Sangeeta Mehra & Another Versus M/s. Parsvnath Developers Delhi State Consumer Disputes Redressal Commission New Delhi
08-01-2019 Thomas Gervase & Another Versus Ravin Mehra High Court of Delhi
04-01-2019 Ram Das Mehra Versus Sunil Kumar Gupta High Court of Judicature at Allahabad
21-12-2018 Atul Omkar Sahay Jauhari Versus State of Maharashtra & Another High Court of Judicature at Bombay
17-12-2018 Atul Vasantrao Parmarthi Versus Pallavi Atul Parmarthi In the High Court of Bombay at Nagpur
03-12-2018 M/s. Varsha Polymers, Ernakulam, Represented by Its Partner P.J. Eldhos & Others Versus M/s. Vajra Plastics Industry, Ernakulam, Represented by Its Managing Partner, M.M. Paulose & Another High Court of Kerala
03-12-2018 M/s. Varsha Polymers, Ernakulam, Represented by Its Partner P.J. Eldhos & Others Versus M/s. Vajra Plastics Industry, Campannur, Ernakulam District, Its Managing Partner M. M. Paulose & Another High Court of Kerala
16-11-2018 Atul Kanti Tripathi Versus Kuber Media Ltd. High Court of Delhi
15-11-2018 Income-Tax Officer Versus Sai Siddhi Atul Income Tax Appellate Tribunal Pune
12-11-2018 M/s. Tata Motors Pvt. Limited & Another Versus Atul Kumar Aggarwal & Others Union Territory Consumer Disputes Redressal Commission UT Chandigarh
01-11-2018 Ajay Mehra Versus M/s. Reebok India Company & Another Union Territory Consumer Disputes Redressal Commission UT Chandigarh
26-10-2018 Tripat Chaudhary & Another Versus Arundhati Sapru Mehra & Another High Court of Delhi
08-10-2018 Deepak Mehra & Others Versus M/s. EMAAR MGF Land Limited & Others Union Territory Consumer Disputes Redressal Commission UT Chandigarh
04-10-2018 M/s. Metro Motors Versus Atul Kumar Aggarwal & Others Union Territory Consumer Disputes Redressal Commission UT Chandigarh
18-09-2018 Atul Jain, Chennai Versus Ito Non Corporate Ward 10(3) Income Tax Appellate Tribunal Chennai
31-08-2018 Alankar Sahkari Griha Rachana Sanstha Maryadit, through Chairman S.K. & Others Versus Atul Mahadev Bhagat & Others High Court of Judicature at Bombay
30-08-2018 Ami Shah L/H of Late Atul K. Versus The Income Tax Officer Income Tax Appellate Tribunal Ahmedabad
28-08-2018 Ashwani Kumar Mehra Versus Canara Bank High Court of Delhi
08-08-2018 Shweta Gulati & Another Versus The State Govt. of NCT of Delhi High Court of Delhi
07-08-2018 Atul Modi Versus State of Mp & Others High Court of Madhya Pradesh Bench at Indore
26-07-2018 Atul Choure Versus Aparna Choure & Another High Court of Madhya Pradesh
23-07-2018 ITO Non Corp Ward 15 (3), Chennai Versus Mayuri Atul Shah, Chennai Income Tax Appellate Tribunal Chennai
23-07-2018 Ashu Gutpa Versus Varsha Jain High Court of Delhi
20-07-2018 Sunil Mehra Versus The State (Govt. of NCT of Delhi) High Court of Delhi
19-07-2018 Varsha Thakur Versus The State of Maharashtra & Another In the High Court of Bombay at Aurangabad
12-07-2018 Arvind Kumar Mehra Versus State of M.P. & Others High Court of Madhya Pradesh
06-07-2018 Varsha Gautham Versus Union of India & Others High Court of Delhi
02-07-2018 Monika Mehra & Another Versus State & Others High Court of Jammu and Kashmir
01-06-2018 Radhey Shyam Versus Varsha Yadav High Court of Delhi
30-05-2018 CDR Rohit Mehra (0369W) Versus Union of India & Others High Court of Delhi
29-05-2018 Ajay Mehra V/S C.E, C. & C.G.S.T., Delhi-1 Customs Excise Service Tax Appellate Tribunal New Delhi
09-05-2018 Atul Gupta Versus State High Court of Rajasthan Jaipur Bench
03-05-2018 M/s. Omaxe Limited, through its authorized representative namely Atul Arya Versus Kiranbala Haryana State Consumer Disputes Redressal Commission Panchkula
01-05-2018 Atul Kumar Gupta Versus State of U.P. High Court of Judicature at Allahabad
01-05-2018 Atul Mittal Versus Khushal Infratech Private Limited National Company Law Appellate Tribunal
26-04-2018 Sanjay Gulati V/S Harsh Lata In the High Court of Punjab and Haryana at Chandigarh
26-04-2018 Atul Roy Versus Technofac Contracts Pvt. Ltd. & Others National Company Law Appellate Tribunal
23-03-2018 Satyendra Kumar Mehra @ Satendera Kumar Mehra Versus State of Jharkhand Supreme Court of India
22-03-2018 S.V. Varsha Versus M/s. IFFCO TOKIO Gen. Ins. Co. Ltd., Bengaluru & Another High Court of Karnataka
20-03-2018 M/s. Emerging Valley (P) Ltd. & Another Versus Kirti Mehra & Others Union Territory Consumer Disputes Redressal Commission UT Chandigarh
08-03-2018 Atul Kumar Agarwal & Others Versus Securities & Exchange Board of India, SEBI Bhavan SEBI Securities Exchange Board of India Securities Appellate Tribunal
06-03-2018 Atul Sharma Versus Gudearth Homes Infracon Pvt. Ltd. National Company Law Appellate Tribunal
19-02-2018 State of Uttarakhand Versus Atul Kumar Saini High Court of Uttarakhand
14-02-2018 The Marathwada Legal and General Education Society Through its Secretary Dr. Kalpalata Patil Bharaswadkar & Another Versus Varsha Manohar Dhongade & Another In the High Court of Bombay at Aurangabad
31-01-2018 Atul Nayar Versus Ideb Grand Reality Pvt. Ltd. National Consumer Disputes Redressal Commission NCDRC
27-01-2018 Atul Sharma Versus State High Court of Delhi
23-01-2018 Atul Versus The State of Maharashtra, Through Secretary, Home Department, Mantralaya, Mumbai-32 & Others In the High Court of Bombay at Aurangabad
22-01-2018 TATA Power Delhi Distribution Limited Versus Neeraj Gulati High Court of Delhi